Can’t find what you need or looking for extra help? Contact us to connect with a dedicated WashUp and car wash expert.
Contact UsGet a new site running in WashUp—confirm its details, switch on the modules it needs, map the wash, assign your team, and copy what already works.
Opening a second site is mostly copying what already works at the first one. We've broken it into steps:
WashUp creates the location record itself, so contact them to have the site added to your company.
Once it exists, open Settings > Locations, select the site, and fill in Location Details: Name of Location, Street Address, City, State, Zip Code, Country and Timezone.
Use the name your crew already says out loud. It shows in the location picker and on every record the site produces. Timezone matters most—task windows, service due dates and inspection timestamps all run off it, and nobody can work at a location that doesn't have one.
Modules are switched on per location, not per company, so a new site starts with My Wash only. Inspections, Services, Tasks, Incidents, Scheduler and Chat each have to be added for this site, even when your other sites already have them.
Select a module in the side menu. If it isn't on yet you land on a page describing it with a Contact Sales to Add button.
Bays and equipment come first, because Inspections, Services and Tasks all pull from them.
With no bays yet, My Wash offers three ways in:
For a second site of the same build, duplicating is the fast route and brings the inspections with it. See Roll out WashUp to another location.
Nobody sees a location until they're assigned to it. Open Settings > Locations, select the site, then the Assigned Users tab, and select Assign User. For people who don't have an account yet, Copy User Invite Link at the top of the page gives you a link that lasts 30 days.
Assigning someone switches on every email and push notification for this location. Each person turns off the ones they don't want under Settings > Notifications.
Inspections come across with the bay copy in step 3. Task lists have their own route, and both are covered step by step in Roll out WashUp to another location.
Building from scratch instead? Start with Build an inspection.