Help Center
Contact
Help Center

Help Center

Getting Started
Everything you need to know to get started and get to work in WashUp.
Using WashUp
From inspections to checklists, learn how WashUp works from top to bottom.
Setup Examples
Set up your site right to streamline operations and get the most from every feature.
Video Library
Your go-to hub for getting started, learning features, and mastering WashUp—one video at a time.
Template Library
A collection of car wash focused templates to help you in every task you might encounter.
Changelog
Stay up to date on all the latest improvements and updates in WashUp.
Login
Getting Started
Using WashUp
Dashboard
My Wash
Inspections
Services
Tasks
Incidents
Employee Scheduler
Chat
Insights
Settings
Service Partner
Setup Examples
Video Library
Template Library
Changelog
Need more help?

Can’t find what you need or looking for extra help? Contact us to connect with a dedicated WashUp and car wash expert.

Contact Us
Help Center
Using WashUp

Scheduler

Add shifts with Shift Quick Add

Drag shift types straight onto the week to add several draft shifts in a row, without opening the shift form each time.

Filling a new week one form at a time is slow. Shift Quick Add puts your shift types in a panel beside the week, and you drag them onto people's days.

What you'll need

  • Available on the Bundle plan, or on a Custom plan that includes Employee Scheduler.
  • Super Admins and Admins who build the schedule.
  • Shift types for the location. See Set up shift types and breaks.
  • A wider screen. Shift Quick Add isn't offered on phones.

Add shifts by dragging

To use Shift Quick Add:

  1. Select Schedule > Create Schedule and stay on the week view.
  2. Select Create > Shift Quick Add.
  3. Drag a shift type from the panel onto a person's day.
  4. Let go. The shift saves as a draft with that type's times.
  5. Keep dragging until the week is filled in.

The totals and the Publish count update after each drop. Drop a shift type on the Open Shifts row instead to add a draft open shift with 1 spot that anyone eligible can pick up.

What stops a drop

The day turns red when the drop would be refused, and amber when it'll be added with a warning.

What's on that dayWhat happens
An overlapping shift, at any locationRefused
Approved time offRefused
An hour limit set to Block itRefused
Pending time offAdded, with a warning
Approved unavailabilityAsks you to confirm the override first
An hour limit set to Warn onlyAdded, with a warning

Days before today and days the person already works at another location can't take a drop.

Good to know
  • The panel stays open as you move between weeks and locations, until you close it or switch to Day View, Month View, or List View.
  • To change a shift you dropped, select it to open Edit Shift, the same as any other shift.
  • Edit shift types in the panel opens your shift types, for anyone allowed to edit them.

Common questions

Does a dropped shift go out to my team right away?

No. It's a draft until you publish the week, even if the rest of the week is already published.

Can I set custom times when I drop a shift?

No. A drop uses the shift type's times. Open the shift afterward to change them.

Related articles

Build and publish a scheduleSet up shift types and breaksSet hour limits for people and locationsUse the Employee Scheduler on a phone or tablet

Resources

Last updated:
November 24, 2026
WebsiteTermsPrivacyContact
© 2025 Wash Up LLC